Location: Arlington, Virginia
Owner: Verizon
Engineer: WTA, Inc.
Completion: 2018
Project Description:
Installation of a new 8000-gallon diesel fuel above ground storage tank (AST) and installation of a new 4300-gallon day tank in the sub-basement generator room. The existing 10,000 gallon underground fuel storage tank and associated fuel piping was removed.
Posted in Mission Critical